Skip to content
English
  • There are no suggestions because the search field is empty.

Assembly I-8: Ceiling Application

Substrate prep and surface notes for Assembly I-8: Ceiling Application

This article addresses technical details for: Assembly I-8: Ceiling Application.

Preparation Requirements

Achieving a professional brick finish starts with the surface. This assembly guide outlines the specific adhesive, fastener, and moisture barrier requirements for this substrate to ensure a 100-year bond. Follow these specifications to maintain your system warranty.